Schedule
Collision Viewer

See where your schedules meet.

Compare planned start times and entered durations in one clear timeline.

Review a two-hour window.

JobCron expression (5 fields)Assumed minutes

Schedule timeline

13Total startsA: 8 · B: 4 · C: 1
1Simultaneous start times10:00 UTC
7Pairwise overlap intervalsFrom assumed durations
3Peak assumed active10:05–10:12 UTC

Durations are entered assumptions, not observed runtimes. End-to-start touching is not an overlap.

Starts inside this one-date window only; earlier running jobs are not included. Intervals are half-open [start, end). Up to 6 schedules and 2,000 starts.

Make the most of your schedule.

Confirm the timezone

Make sure the timezone matches how your team plans and runs jobs.

Enter realistic durations

Use typical or worst-case durations to spot potential overlaps.

Review real job behavior

After deploying, compare observed runtimes to your assumptions and refine.

Questions, Answered.

Are these actual job overlaps?

No. The timeline combines scheduled starts with the durations you enter.

Does changing UTC update my server?

No. UTC is the preview setting. This site does not connect to or configure a server.

What does a simultaneous start mean?

Two or more planned runs begin at the same minute. Duration overlap is counted separately; touching ends and starts do not overlap.